Energimyndigheten Söksida
Sökresultat
Din sökning på energibalans i sverige 2017 gav 7900 träffar
Sortera efter:
Relevans
Datum
Utvald träff
Labelling_DRAFT_reg-V01.pdf
EN EN
Possible requirements for electronic displays
COMMISSION Delegated REGULATION (EC) No …/2015
of XXX
supplementing Directive 2010/30/EC of the European Parliament and of the
Utvald träff
Guidelines for Displays-draft proposal - for members.docx
DRAFT Guidelines accompanying
Commission Regulations (EU) No 2019/2021 & (EU) 2019/2013 Laying down Ecodesign and Energy Labelling Requirements for Electronic Displays
3
Table of
Utvald träff
Ecodesign_Kettles_Task_6_20201214_V09_Final_Draft.pdf
Team:
Contract technical team leader: Antoine Durand (Fraunhofer ISI)
Contractors: VITO (Belgium) and Fraunhofer ISI (Germany)
07.12.2020
Preparatory study for Kettles
Utvald träff
Contribute to knowledge about the sustainability of bioenergy and bio-based raw materials.pdf
Contribute to knowledge about the
sustainability of bioenergy and bio-
based raw materials
In this call for proposals the Swedish Energy Agency is providing support for
research projects
Andra har också sökt
Utvald träff
Inspel Memo from Thema Consulting.pdf
1
How should a stop mechanism for the
electricity certificate market be designed?
THEMA Memo 2018-02
www.thema.no © 2018 THEMA Consulting Group
About the project About
Utvald träff
International C3E Awards Program FAQ.pdf
C3E Awards Frequently Asked Questions - 1
The International C3E Awards Program – FAQ
Table of Contents
What is the International C3E Awards Program? ......................................
Utvald träff
CDM 2009-10-01 - 2010-06-10.pdf
Dnr Date Project Titel Project Participant Host country Emission reductions Comment
880-10-2378 2010-06-08 Luogu 10MW Hydropower
Station Project in Sichuan
Province
Carbon Asset
Management
Utvald träff
Diskussionspapper till CF kranar 191218.docx
Discussion note on Taps and showers
Introduction
As planned in the Ecodesign Working Plan 2016-2019[footnoteRef:1], the Commission services have updated the preparatory study on taps and showers.
Utvald träff
Antagen energimärkning 2015 1094 eng.pdf
REGULATIONS
COMMISSION DELEGATED REGULATION (EU) 2015/1094
of 5 May 2015
supplementing Directive 2010/30/EU of the European Parliament and of the Council with regard
to the energy labelling
Utvald träff
5CDM_LoA_20091001-20100610.pdf
Dnr Date Project Titel Project Participant Host country Emission reductions Comment
880-10-2378 2010-06-08 Luogu 10MW Hydropower
Station Project in Sichuan
Province
Carbon Asset
Management