Energimyndigheten Söksida
Sökresultat
Din sökning på energibalans i sverige 2017 gav 6007 träffar
Sortera efter:
Relevans
Datum
Utvald träff
EPS ecodesign 2019-1782_191025_EN.pdf
COMMISSION REGULATION (EU) 2019/1782
of 1 October 2019
laying down ecodesign requirements for external power supplies pursuant to Directive 2009/125/EC
of the European Parliament and of the
Utvald träff
Bilaga Ekodesignförordning Externa Nätaggregat förslag180713.pdf
EN EN
EUROPEAN
COMMISSION
Brussels, XXX
[…](2018) XXX draft
ANNEXES 1 to 4
ANNEXES
to the
COMMISSION REGULATION
implementing Directive 2009/125/EC of the European
Utvald träff
EuP_Lot24_Dish_T8_ENER_clean.pdf
Preparatory Studies
for Eco-design Requirements
of Energy-using Products
Lot 24: Professional
Washing Machines, Dryers
and Dishwashers
Tender No. TREN/D3/91-2007
Final
Utvald träff
Evaluation of the Swedish programme for international climate change mitigation within the Kyoto protocol.pdf
EVALUATION OF THE SWEDISH
PROGRAMME FOR INTERNATIONAL
CLIMATE CHANGE MITIGATION
WITHIN THE KYOTO PROTOCOL
FINAL REPORT
SWECO SWEDEN, MARCH 2022
AUTHORS: JONAS NIKI HUGOSSON, ROBERT UDÉN,
Andra har också sökt
Utvald träff
Draft Standby ecodesign reg_7January2022.pdf
EN EN
EUROPEAN
COMMISSION
Brussels, XXX
[…](2021) XXX draft
COMMISSION REGULATION (EU) …/…
of XXX
laying down ecodesign requirements for off mode, standby mode, and
Utvald träff
Antagen-Ekodesignförordning-Gatu-Kontorsbelysning_245-2009 eng.pdf
COMMISSION REGULATION (EC) No 245/2009
of 18 March 2009
implementing Directive 2005/32/EC of the European Parliament and of the Council with regard to
ecodesign requirements for fluorescent lamps
Utvald träff
AntagenEkodesignförordning_KylarFrysar_EN_643-2009.pdf
COMMISSION REGULATION (EC) No 643/2009
of 22 July 2009
implementing Directive 2005/32/EC of the European Parliament and of the Council with regard to
ecodesign requirements for household
Utvald träff
ecohotwater_task2_final.pdf
Task 2 - final
DISCLAIMER & IMPORTANT NOTE
The authors accept no liability for any material or immaterial direct or indirect damage resulting from the
use of this report or its content.
This
Utvald träff
Potential for transformation of CDM activities Executive summary 20191122 v2.pdf
Potential for transformation of CDM activities
into Article 6 activities under the
Utvald träff
CDM 2005-05-25 - 2009-02-28.pdf
Date for
LoA
decision
Project Title Project
Participant
Host
Country
Emission
reductions
Registration
reference
1
2005-05-25 18 MW Biomass
Power Project in
Tamilnadu, India"