Energimyndigheten Söksida
Sökresultat
Din sökning på gör en energikalkyl gav 5444 träffar
Sortera efter:
Relevans
Datum
Utvald träff
Guidance document_Lot 26_Networked Standby_Final Draft to CF.pdf
Guidelines accompanying Commission Regulation
(EU) No 801/2013 of 22 August 2013
amending Regulation (EC) No 1275/2008 with regard
to ecodesign requirements for standby, off
mode electric
Utvald träff
Consumer Monitor 2023 Country Report Sweden.pdf
Lieselot Vanhaverbeke, Dennis Verbist, Gabriela Barrera, VUB-MOBI Electromobility Research Centre,
Máté Csukas, FIER, Rein Jüriado, EC DG-MOVE
June - 2024
Consumer
Monitor
2023
EUROPEAN
Utvald träff
Guidance document_Lot 26_Networked Standby_Final Draft to CF.pdf
Guidelines accompanying Commission Regulation
(EU) No 801/2013 of 22 August 2013
amending Regulation (EC) No 1275/2008 with regard
to ecodesign requirements for standby, off
mode electric
Utvald träff
Guide_Ecodesign, energy labelling electric heat pumps, electric boilers_2015-784.pdf
Nordsyn – ecodesign and energy
labelling requirements for electric
heat pumps and electric boilers
Nordsyn – surveillance co-operation for green products THE NORDIC REGION
– leading in green
Andra har också sökt
Utvald träff
Towards reliable nonlinear simulations of WECs using CFD.pdf
2016-05-12 Chalmers | Department of Shipping and Maritime Technology 1
Towards Reliable Nonlinear Simulations of
WECs Using CFD
Project participants: Johannes Palm, Lars
Utvald träff
NORDSYN vägledning EU-krav varmvattenberedare med värmepump.pdf
Nordsyn – ecodesign and energy labelling
requirements for electric heat pump water
heaters and electric conventional water heaters
Nordsyn – surveillance co-operation for green products THE
Utvald träff
BIO_EuP_Lot20_Task_5_Final Report.pdf
Preparatory Studies for Ecodesign
Requirements of EuPs (III)
ENER Lot 20 – Local Room Heating Products
Task 5: Definition of Base-Cases
European Commission, DG ENER
25 June 2012
Developed
Utvald träff
ecohotwater_task3_final.pdf
Task 3 –final
DISCLAIMER & IMPORTANT NOTE
The authors accept no liability for any material or immaterial direct or indirect damage resulting from the
use of this report or its content.
This
Utvald träff
NORDSYN Rapport om effekter av marknadskontroll.pdf
The Nordic Ecodesign Effect Project
Estimating benefits of Nordic market surveillance of ecodesign and energy labelling
Ved Stranden 18
DK-1061 Copenhagen K
www.norden.org
The project presents a
Utvald träff
EuP_Lot24_Wash_T4_Report_ENER_clean.pdf
Preparatory Studies
for Eco-design Requirements
of Energy-using Products
Lot 24: Professional
Washing Machines, Dryers
and Dishwashers
Tender No. TREN/D3/91-2007