Energimyndigheten Söksida
Sökresultat
Din sökning på gör en energikalkyl gav 4704 träffar
Sortera efter:
Relevans
Datum
Utvald träff
Addendum report on Comfort Fans.pdf
1
½
Review of Regulation 206/2012 and 626/2011
Air conditioners and comfort fans
Addendum regarding
Utvald träff
Vacuum cleaner review_final report_June2019.pdf
Review study on Vacuum cleaners
Final report
Viegand Maagøe A/S
Van Holsteijn en Kemna B.V.
June 2019
Utvald träff
Testrapport LED-belysning 2015.pdf
Test Report – Clear, Non-Directional LED Lamps
Updated to reflect 1000 hours testing and with a detailed
discussion on LightingEurope’s comments on this report
A test report
Utvald träff
EuP_Lot5_Task7_August2012_FINAL.pdf
Energy-Using Product Group Analysis - Lot 5
Machine tools and related machinery
Task 7 Report – Policy and Impact Analysis
Sustainable Industrial Policy -
Andra har också sökt
Utvald träff
Förstudie utrustning bildbehandling-1.pdf
EuP Preparatory Study Lot 4 (IE) Final Report Task 1 12th November 2007
T1 page 1
Report for Tender No. TREN/D1/40 lot 4-2005 Fraunhofer IZM
EuP Preparatory Studies
“Imaging
Utvald träff
Mobility as a service_full announcement text.pdf
Datum 1 (18)
2019-05-14
Participate in testing sustainable
mobility solutions to reach an
accelerated market introduction
Global climate goals are set and the journey
Utvald träff
Utlysningstext Utlysning 3_ENG.pdf
1 (20)
Datum
2019-04-24
The Research and
Innovation Programme
Energy-efficient Building
and Living, E2B2, Call for
Proposals 3
This call for
Utvald träff
Bilaga förslag ekodesign Torktumlare juli 2019.pdf
1
Brussels, XXX
[…] (2019) XXX draft
ANNEXES 1 to 5
ANNEXES
to the
COMMISSION REGULATION (EU) …/…
laying down ecodesign requirements for household
Utvald träff
guidelines_for_smes_1275_2008_okt_09.pdf
- 1 -
Guidelines accompanying Commission Regulation (EC) No 1275/2008 of
17 December 2008 implementing Directive 2005/32/EC of the European
Parliament and of the Council with regard to
Utvald träff
Ecodesign_Kettles_Task_3_20201218_V27_Final.pdf
Team:
Contract technical team leader: Antoine Durand (Fraunhofer ISI)
Contractors: VITO (Belgium) and Fraunhofer ISI (Germany)
18.12.2020
Preparatory study for Kettles