Energimyndigheten Söksida
Sökresultat
Din sökning på energiindikatorer 2015 uppföljning av sveriges energipolitiska mål gav 4554 träffar
Sortera efter:
Relevans
Datum
Utvald träff
Working document Review Ecodesign Tranformers.doc
28/09/2017
Working document on the review of Commission Regulation (EU) No 548/2014 of 21 May 2014 on implementing Directive 2009/125/EC with regard to small, medium and large power transformers
Utvald träff
Värdebeskrivning Riksintresse vindbruk 2013 land.pdf
Värdebeskrivning riksintress vindbruk 2013 på land, bilaga 4
ObjID_2013
OBJECTID
Remiss ORIGINALID
Area_km
2
AntalV
erk
Effekt_
min
Effekt_
max Årspr_min
Årspr_
max FM_stopp AreaBygg
Utvald träff
244_2009 Eng konsoliderad.pdf
This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents
►B COMMISSION REGULATION (EC) No 244/2009
of 18 March 2009
implementing
Utvald träff
Program Wind Power Research in Focus 2020.pdf
PRELIMINARY PROGRAM
Wind Power Research in Focus
2020
The conference will take place on October 13, 2020.
Wind Power Research in Focus is for everyone interested
in the latest
Andra har också sökt
Utvald träff
Liight.pdf
Liight
Website / Facebook page (link):
www.liight.es
Location:
Mostoles, Madrid, Spain
PROPOSAL TITLE (10 words)
Liight, gamifying sustainability trought smart city systems.
Utvald träff
Final Program Wind Power Research in Focus.pdf
Abbreviations: KTH – Royal Institute of Technology, CTH – Chalmers Institute of Technology, RISE – Research Institutes of Sweden
9:00-10:30 Introduction session (moderator: Charlotte Unger
Utvald träff
presentation_submitting.pdf
ERA-NET Cofund Urban Accessibility and Connectivity
Sino-European Call
UDiManager – uefiscdi-direct.ro
ERA-NET Cofund Urban Accessibility and Connectivity Sino-European call
Utvald träff
Innovation Fund Essential elements of 1st call of proposals.pdf
Innovation
Fund
Essential
elements of
1st call of
proposals
Selectio
n
criteria
?
Mileston
es
?
PDA?
Knowled
ge-
sharing
require
ments
?
• Will the existing MRV requirements be
Utvald träff
Appendix Production Units GO.pdf
APPENDIX
Utvald träff
Crediting Early Action final report Schneider Ahonen.pdf
Crediting early
action: options,
opportunities and
risks
Lambert Schneider
Hanna-Mari Ahonen
January 2015
Executive Summary
Incentivising prompt mitigation action is a key