Energimyndigheten Söksida
Sökresultat
Din sökning på om insatsprojektet 2017.pptx gav 4326 träffar
Sortera efter:
Relevans
Datum
Utvald träff
ventilation_ecodesign_1253-2014_EN.pdf
COMMISSION REGULATION (EU) No 1253/2014
of 7 July 2014
implementing Directive 2009/125/EC of the European Parliament and of the Council with regard
to ecodesign requirements for ventilation
Utvald träff
apply-and-report.pdf
STRATEGIC VEHICLE RESEARCH AND INNOVATION (FFI)
Applying for and
reporting FFI projects
March 2019
FFI Strategic Vehicle Research and Innovation | www.Vinnova.se/ffi
Utvald träff
Task 32 Final Prolongation proposal for new triennium 2016-2018.pdf
ExCo76 Doc 05.01
TASK 32
Biomass Combustion and Cofiring
Final Proposal for Task Prolongation for
the new triennium 2016-2018
ExCo76
Berlin, Germany
26
Utvald träff
Apply and report March 2019.pdf
STRATEGIC VEHICLE RESEARCH AND INNOVATION (FFI)
Applying for and
reporting FFI projects
March 2019
FFI Strategic Vehicle Research and Innovation | www.Vinnova.se/ffi
Andra har också sökt
Utvald träff
Energy shortage - Coordinated handling of a potential disturbance in the Nordic power system.pdf
1
Energy shortage
Coordinated handling of a potential disturbance in the Nordic power system
Accepted at the NordBER meeting 9-10 Sept 2015 in Reykjavik
2
Utvald träff
20210114_FoV_jc2_call_text.pdf
Innovating the forest-based bioeconomy
JOINT CALL FOR
RESEARCH PROPOSALS
IN 2021
CALL TEXT
This project has
Utvald träff
ecohotwater_task4_final.pdf
DISCLAIMER & IMPORTANT NOTE
The authors accept no liability for any material or immaterial direct or indirect damage resulting from the
use of this report or its content.
This report contains the
Utvald träff
Preliminart-forslag-ekodesign-ED.pdf
EN EN
Brussels, XXX
[…](2021) XXX draft
COMMISSION REGULATION (EU) …/…
of XXX
laying down ecodesign requirements for mobile phones, cordless phones and tablets
pursuant
Utvald träff
Addendum report fixed double duct.pdf
1
Review of Regulation 206/2012 and
626/2011
Air conditioners and comfort fans
Addendum regarding fixed double duct air
Utvald träff
Ecodesign_Kettles_Task_7_20201223_V44_Draft.pdf
Team:
Contract technical team leader: Antoine Durand (Fraunhofer ISI)
Contractors: VITO (Belgium) and Fraunhofer ISI (Germany)
23.12.2020
Preparatory study for Kettles